U.S. Navy’s $4.4 Billion Stealth Destroyer Towed to Port After Breaking Down in Panama Canal

November 23rd, 2016

Via: AP:

The most expensive destroyer ever built for the US navy has suffered an engineering problem in the Panama Canal and had to be towed to port.

USNI News, a publication of the US Naval Institute, reported on its website that the ship was in the canal when it lost propulsion.

Crew also saw water getting into bearings that connect electrical motors to driveshafts, the website reported.

Posted in Economy, War | Top Of Page

One Response to “U.S. Navy’s $4.4 Billion Stealth Destroyer Towed to Port After Breaking Down in Panama Canal”

Leave a Reply

You must be logged in to post a comment.